Skip to content

Fully insured • Free quotes • 1-year warranty

Our process

How a Lince's Painting project actually runs

Six predictable steps. No surprises. The same project lead from quote to final walkthrough, and a written warranty backing every project.

  1. 01Step 1

    Initial call & site visit

    We listen first. A 10-minute call covers scope, timing, and any pain points from past painting jobs. For most projects we follow up with an in-home or virtual site visit within 48 hours.

  2. 02Step 2

    Written, line-item quote

    You receive a free, written, line-itemed quote naming the specific paint products, number of coats, prep work included, and timeline. No 'as needed' wording, no surprise add-ons.

  3. 03Step 3

    Schedule & colour finalization

    Once approved we lock a start date and walk through colour selections, including in-home sample boards if you'd like a colour consultation.

  4. 04Step 4

    Protection & prep

    Day one is dedicated to protection (drop cloths, plastic, masking) and surface prep: patching, caulking, sanding, and priming. This is the work that determines how long the finish lasts.

  5. 05Step 5

    Painting

    Two coats of premium low-VOC paint, sprayed or rolled depending on surface and access. Crews clean the site daily and provide photo updates if you're off-site.

  6. 06Step 6

    Walkthrough & warranty

    We finish with a thorough walkthrough (touch-ups handled on the spot), and you get a written 1-year workmanship warranty.

Promises in writing

What every Lince's Painting customer gets

These aren't marketing promises. They're written into every quote and contract. If we miss any of them, we make it right at our cost.

Start your project
  • On-time arrival, every day
  • Daily site cleanup
  • Premium low-VOC paints by default
  • Employee crews: no subcontractors
  • Written, line-item quotes
  • 1-year workmanship warranty

Some things are just easier over the phone

(416) 893-4338
CallFree Quote